F67 Series Parallel Shaft Helical Gear Box with Motor

SKU: 6bd6737df421 Category:

Description

Solution Description

F sequence Parallel Shaft-Helical Geared Motor Attributes

one.Characteristics:

  1. Higher performance: 92%-94%
  2. Parallel output, compact structure, massive output torque, sleek operation, lower noise and prolonged services life.
  3. Substantial precision: the gear is made of higher-top quality alloy metal forging, carbonitriding and hardening treatment, grinding process to guarantee substantial precision and secure working.
  4. Large interchangeability: very modular, serial design, powerful versatility and interchangeability.

two. Technical parameters

Ratio three.77-276.77
Enter power .12-200KW
Output torque three.5-21700N.m
Output velocity five-352rpm
Mounting sort Foot mounted, foot mounted with solid shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. 
Input Strategy Flange enter(AM), shaft enter(Advertisement), inline AC motor enter, or AQA servo motor
Brake Release HF-manual release(lock in the brake launch situation), HR-guide launch(autom-atic braking place)
Thermistor TF(Thermistor safety PTC thermisto)
TH(Thermistor safety Bimetal swotch)
Mounting Place M1, M2, M3, M4, M5, M6
Type F37-F157
Output shaft dis. 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm
Housing material HT200 higher-toughness cast iron from R37,47,57,67,seventy seven,87
Housing substance HT250 Large toughness forged iron from R97 107,137,147,
157,167,187
Heat treatment technology carbonitriding and hardening therapy
Efficiency 92%-94%
Lubricant VG220
Safety Class IP55, F class

Starshine Push

ZheJiang Starshine Generate Co.,Ltd,the predecessor was a point out-owned military mould organization, was proven in 1965. Starshine specializes in the comprehensive electrical power transmission remedy for large-finish products manufacturing industries based on the goal of “Platform Product, Software Design and style and Expert Services”.
Starshine have a powerful technical force with in excess of 350 staff at existing, like in excess of 30 engineering professionals, 30 high quality inspectors, covering an spot of 80000 sq. meters and types of sophisticated processing equipment and screening equipments. We have a excellent foundation for the sector application development and service of higher-finish velocity reducers & variators proudly owning to the provincial engineering technologies study center,the lab of equipment pace reducers, and the base of modern R&D.

Our Crew

Good quality Manage
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,JCPTer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the JCPTer’s position on the finished product quality verification, in order to ensure the quality of 
JCPTer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
merchandise is a product inspection to determine the qualified products.

seven. Certification.
All our items get ISO & CE & UL certification.

Packing

Delivery